- SOLARWATT Manager flex
- Connect devices
- Incompatible inverters
Incompatible inverters
The power generated by non-compatible inverters is recorded via separate power meters or energy meters.
Installation and configuration
Interface: S0 (as inverter replacement)
Examples for incompatible inverters
KACO blueplanet NX1 M2 3.0 - 5.0KACO
blueplanet NX3 M2 3.0 - 20.0KACO
blueplanet NX3 M3 10.0 - 33.0
APsystems DS3-L-EU micro inverterAPsystems
DS3-S-EU micro inverter
SMA STP (5.0-10.0) -3SE-40SMA
STP X (12 - 25)
Installation WITH battery system
Also follow the installation instructions of the respective manufacturer!
- Establish and check the absence of voltage.
- Install and connect the devices according to the diagram shown.
- Restore the voltage supply.
System component | Device | Connection type |
---|---|---|
Power metering Inverter | Energy meter (S0) | Direct connection |
Battery system | Battery flex | LAN |
Main meter | ACS | LAN via Battery flex |
Installation WITHOUT battery system (with Shelly 3EM)
Also follow the installation instructions of the respective manufacturer!
- Establish and check freedom from voltage.
- Install and connect the devices according to the diagram shown.
- Restore the voltage supply.
System component | Device | Connection type |
---|---|---|
Power metering Inverter | Energy meter (S0) | Direct connection |
Main meter | Shelly 3EM | WLAN (via router) |
Setup in Smart Setup
Search devices
- Enter S0 meter in the search field for manual search (category energy meter)
- Select the interface to which the S0 counter is connected.
- Enter the pulse rate, this can be found in the meter description.
- Confirm Add device to search.
- Add the S0 meter to the setup by confirming the Find and install devices button.
- After successful installation, the S0 meter appears under Energy meter
PV systems
- Select the corresponding S0 meter as inverter replacement.
ATTENTION! When reading out the inverter data with an S0 meter, the manager does not perform dynamic derating.
House consumption
- Check whether the PV system is properly assigned according to the configuration; in the example, a house-side installation took place.
Selected articles: